When a supplier says a chamber costs a few dollars per session to run, ask which costs are inside that number. In practice, four line items decide whether the unit is profitable, and three of them are usually left out of the sales conversation.
Line item 1: electricity, and the two numbers behind it
Electric running cost is connected load multiplied by hours of actual running, multiplied by your tariff. The trap is using the steady-state figure for the whole day. A chamber draws far more during pull-down than while holding temperature, so a site that switches the unit on at 8am and off at 8pm is not paying the steady-state number for twelve hours.
Build the estimate from three inputs: pull-down kW and duration, steady-state kW, and your electricity rate. Then add the ancillary load nobody quotes, which is the room itself. Air conditioning, dehumidification and lighting in a cold room often run all day.
Line item 2: nitrogen, if you use it
For nitrogen chambers, cost per session is litres consumed multiplied by your delivered price per litre, and the delivered price is where the surprises live. Cylinder or dewar rental, delivery charges, minimum order quantities and boil-off on stored liquid all change the effective price. A cheap headline rate with a weekly delivery minimum can cost more than a higher rate with monthly delivery.
Ask for consumption at your session length, not at the supplier test bench. Consumption scales with session time and with how long the cabin door stays open between clients.
Line item 3: labour, the largest and most ignored
Staff time is usually the biggest running cost in a small operation and it never appears in an equipment quotation. Count the minutes per client that are actually occupied: intake, clothing change, the session itself, drying and reset, and cleaning between clients. Then multiply by your hourly staff cost.
This is also a sizing decision in disguise. If a protocol needs fifteen staff minutes per client and your peak is twenty clients, you need five staff hours at peak, which may be the real constraint on your day, not the chamber.
Line item 4: maintenance and downtime
Maintenance has a predictable part and an unpredictable part. The predictable part is consumables and scheduled service: filters, seals, compressor service, sensor calibration. Ask for a schedule with intervals and prices, and ask which of those items are covered by warranty in year one and which are not.
The unpredictable part is downtime. A chamber that is out of service for a week costs you the revenue of that week, plus the clients who do not come back. This is why the service question matters more than the price question: ask who services the unit in your country and what the response time is.
Build your own model before you believe anyone else’s
Put four rows in a spreadsheet: electricity, nitrogen (or zero), labour, maintenance. Fill each with your own rates, not the supplier’s assumptions. Divide the total by your realistic monthly sessions. The number you get is your true cost per session, and it is the only number worth comparing between suppliers.
If the result looks uncomfortable, the fix is usually not a cheaper chamber. It is a different protocol, a different peak schedule, or a different model size.
Where per-session claims break down
A supplier cost per session is usually built on three assumptions: the chamber runs near full utilisation, one attendant handles every client without idle time, and electricity is charged at the cheapest tariff. Real sites rarely hit all three in the first months. New locations typically run well below peak while they build a client base, and the equipment cost per session is highest exactly when revenue is lowest.
The claim also tends to leave out the room. Air conditioning, dehumidification and lighting in a cold room run for the whole day, not for the session. In small sites that load can rival the chamber itself, and it never appears in a quotation for the chamber.
The third gap is idle time. A chamber that sits unused between appointments still costs you the room, the staff rota and the finance payment. That is why the honest way to model this is cost per available hour, then divide by the sessions you actually expect to sell, not the sessions the equipment could theoretically deliver.
What to get in writing before you sign
- Connected load at pull-down and at steady state, in kW, with the breaker rating the unit needs.
- Cool-down and recovery times as measured figures, with the conditions they were measured under.
- Nitrogen consumption at your session length, if you are buying a nitrogen unit.
- Service intervals, consumable prices, and who services the unit in your country with what response time.
- Warranty terms in full, including what is excluded and what the labour arrangement is in year two.
- Installation scope: which parts the supplier does, which parts your own contractor does, and what the site must be ready with on arrival.
If a supplier will not put those six items in writing, treat the per-session number they quoted as marketing rather than planning. You cannot build a business case on a figure you cannot reproduce.
Related reading
- Choosing a Cryotherapy Chamber Model: A Practical Sizing Guide
- 4L Liquid Nitrogen per Session: How This Chinese Cryotherapy Chamber Cuts Costs
- 2026 Guide: Top Cryo Chamber Manufacturers & How to Choose
Equipment for this application
- Electric cryotherapy chambers. Models, room and power requirements
Want the running-cost worksheet filled in for your facility? Send us your electricity rate, session volume and staff cost, and we will model it with you.

Equipment specialists at Yuncong, writing about cryotherapy, float and hyperbaric equipment.