Choosing a Cryotherapy Chamber Model: A Practical Sizing Guide

Yuncong Team

30/10/2026

Most buyers start a cryotherapy chamber purchase with a price comparison. That is the wrong first step, because two chambers quoted at a similar price can serve very different facilities. Sizing comes first, price comes after. Here is the order I would work through.

Start with sessions per day, not with models

Every sizing decision follows from one number: how many sessions you expect on your busiest day, not your average day. A clinic doing 12 sessions on a Saturday and 4 on a Tuesday needs a chamber that handles the Saturday. Write that peak number down before you open any quotation.

Then multiply it by your session length, including the changeover minute between clients. That gives you the hours of chamber time you actually need. If the number is above your opening hours, you need either a second chamber or a shorter protocol. This is the first place where buyers get caught: they buy one chamber and then discover their revenue ceiling is their equipment, not their marketing.

The five variables that decide the model

  1. Peak sessions per day, and session length you plan to run.
  2. How many staff you will have on the floor during peak. One attendant per client during the session is the practical minimum for a walk-in operation.
  3. Room footprint, including door swing, control clearance and a chair for waiting clients.
  4. Power available at the site. Ask for the connected load of the model you are considering, in kW, and check it against your supply before you sign a lease.
  5. Cooling method you can actually support: electric or liquid nitrogen. This is decided by your building and your supply chain, not by preference.

Electric or nitrogen: decide with four questions

This decision comes up in every project, and it is usually argued on running cost. I would argue it on feasibility first, because a chamber you cannot refill reliably is not a chamber.

  • Can you receive nitrogen deliveries on a regular schedule, and do you have somewhere to store dewars safely? If not, electric removes a dependency entirely.
  • Is your electrical supply able to take the connected load at pull-down, not just at steady state? Pull-down is the number that trips breakers.
  • How fast do you need to recover temperature between clients? Recovery time sets your real throughput.
  • What is your backup plan if a delivery is late? With nitrogen, the answer is often closing for the day.

What to ask before you compare prices

Ask every supplier the same eight questions and put the answers in writing. If a supplier cannot answer them in writing, that tells you something too.

  1. What is the connected load in kW, at pull-down and at steady state?
  2. What is the measured cool-down time from room temperature, and from a normal working temperature after a session?
  3. What is the internal cabin dimension and the usable floor space with the door open?
  4. What is the standard production lead time, and what is the installation time on site?
  5. What does the warranty cover, for how many years, and what is excluded?
  6. Which spare parts are consumables, and what do they cost per year at my volume?
  7. What documentation comes with the unit: electrical drawings, CE certificate for this model, installation manual, maintenance schedule?
  8. Who services the unit in my country, and what is the response time?

Three sizing mistakes I see repeatedly

  • Buying for average volume instead of peak volume, then turning clients away at the weekend.
  • Ignoring the room. A chamber that fits the equipment list can still fail on door swing, ceiling height or floor loading.
  • Skipping the power check until after the lease is signed. Remedial electrical work is often the most expensive line in the project.

If you send me your peak sessions per day, your room dimensions and your electrical supply, I can tell you which of our models fits and which does not. That conversation is usually faster than reading six spec sheets.

What changes once you pick a model

The chamber is one line in the project, not the whole project. The rest of the list is the room: insulation, floor loading, door width for getting the unit in, drainage if the site needs it, and ventilation for the space around the cabin. On the electrical side it is the run from your panel to the room, the breaker rating, and whether the supply can take the pull-down load while everything else in the building is running.

Ask for the installation drawing set before you commit to a room. A supplier who can send dimensioned drawings, a power requirement and a floor plan in the first reply is a supplier who has installed units before. If the drawing arrives only after the deposit, you are paying to find out.

Commissioning matters as much as delivery. Ask who attends, how long they stay, and what test proves the unit is working to specification on the day. A cool-down test witnessed by your own staff is worth more than a signed handover sheet.

One more practical point: lead time usually starts when the deposit clears and the drawings are approved, not when you ask for a quotation. If your opening date is fixed, work backwards from the installation date, not from the order date.

Three questions buyers ask us most

Can we start with one chamber and add a second later? Yes, and the cheapest way to do it is to plan for it now: leave the floor space, the door width and the spare capacity at the panel. Retrofitting power later costs more than the second chamber.

Do we need medical staff on site? That depends on how your market regulates the service you sell, not on the equipment alone. We supply equipment; what you are allowed to offer, and who must supervise it, is a local question. Ask your regulator before you sign a lease, not after.

What if volume comes in lower than we planned? The usual answer is a shorter protocol and longer opening hours, but check the model can run a short session without losing temperature. A chamber sized for a long protocol can be inefficient at a short one, and that is worth testing on a reference site before you buy.

Related reading

Equipment for this application

Not sure which chamber fits your room and your peak volume? Send us the three numbers and we will size it with you.

Get a Sizing Recommendation